Name
Title
Comments
Contact
Contact E-Mail Address
Contact Name
Contact Picture
Rollup Image
 
Target Audiences No targeting
Hide physical URLs from search
Page Image
 
Page Content

​​Burlington Road at Illinois 47 Roundabout


​Featured Project

The intersection of Burlington Road and Illinois Route 47 in Campton Hills, Illinois was a four‐way stop between two two‐lane highways. All‐way stop control eliminated a rash of severe crashes but was insufficient to handle growing traffic volumes. Initially, the Kane County Division of Transportation (KDOT) saw a traffic signal concept as the answer – but storage and taper requirements used pavement inefficiently and reintroduced safety concerns. When expanding pavement, drainage and right‐of‐way requirements threatened to price the improvement out of budget, KDOT directed their consultant, Burns & McDonnell, to find another way.

KDOT and Burns & McDonnell brainstormed the idea of a roundabout. The case for it was so compelling that the Illinois Department of Transportation (IDOT) quickly approved the change to a roundabout – a first for an arterial highway in northeastern Illinois. The new roundabout required half the pavement of a signalized intersection and cost $1 million less than the final estimate for the traffic signal design. STV’s proactive construction management and Martam’s skilled construction crews kept costs within 2% of the bid price. The expandable design improves capacity and traffic flow, accommodates large trucks and will help encourage more roundabouts in Illinois.

Summary Links
Byline
Article Date
Image Caption
Browser Title
Meta Description
Meta Keywords
Hide from Internet Search Engines
Content Type: Article Page