Name
Title
Comments
Contact
Contact E-Mail Address
Contact Name
Contact Picture
Rollup Image
 
Target Audiences No targeting
Hide physical URLs from search
Page Image
 
Page Content

​​Randall Road over I-90 Feasibility Study

Project Overview

A feasibility study is underway for the Randall Road corridor between Big Timber Road and Route 72, centered on I90 (the Jane Addams Tollway). This section of Randall Road is one of the most heavily traveled county highways in Kane County. Randall Road serves multiple critical uses:

  • The region’s sole north-south arterial
  • A critical link to I90 and the Chicago metropolitan area
  • A generator of commercial and industrial development

The study will encompass the review and analysis of traffic volumes, crash history, drainage concerns, bridge condition, environmental and socioeconomic factors, along with stakeholder concerns. The study is expected to last for two years, with a final study providing several feasible alternatives for further design consideration.

Stakeholders and residents will have several formal opportunities to provide formal input on the corridor and to receive updates as the study proceeds. A project specific website is available at randallover90.com, and comments can also be left there.

Summary Links
Byline
Article Date
Image Caption
Browser Title
Meta Description
Meta Keywords
Hide from Internet Search Engines
Content Type: Article Page